VINH TAN 4 THERMAL POWER PLANT

Year start 01/2018

Client: BCA Thang Long - HCMC

Capacity: 2 x 600 MW

Scope of work:  Model Revit 3D Piping system follow Concept Design and Check clash via SP3D

Vinh Tan 4 Thermal Power Plant  is one of the imperative projects to address the power shortage in the South from 2018 of the Government. The project is owned by EVN and EVNGENCO 3 involves in as a project management consultant.

 